Home » Estimates » Production offers

Production estimate

hicad production estimate

For a correct production estimate we need the documents as below:

  • List of materials (please specify values, possible tolerances, packages (type of), quantities and references on p.c.b. serigraphic layout.
  • Topographical schematics of mounting/s side/sides with circuital references (gerber, dxf, pdf format).

For production we need the documents as below:

  • List of materials (please specify values, possible tolerances, packages (type of), quantities and references on p.c.b. serigraphc layout.
  • Topographical schematics of mounting/s side/sides with circuital references (gerber, dxf, pdf format).
  • Co-ordinate files of components per each mounting/s side/sides with references, coordinates, values.

If we supply the printed circuit:

  • Complete set of gerber files and possible notes for p.c.b. in-frame-setting.

If we supply the mounting leaf:

  • Serigraphic layout, copper side, solder resist and solder paste or glue per each mounting/s side/sides, and possible notes for p.c.b. in-frame-setting.

For any information, please contact us!